Daily job-site photo report: a simple template that clients read
Send clients and project managers a short, organized photo report from the job site each day or week, as a single PDF.
Clients want to know their job is moving. Project managers want a record of what was done and when. A short photo report does both, and it cuts down on "just checking in" calls.
The key is keeping it short and consistent, so people actually read it.
A template that works
Use the same sections every time:
- Overview: two or three wide shots that show overall progress
- Completed today: one photo per finished task, with a one-line note
- In progress: what's underway, and what's next
- Issues / decisions needed: anything the client has to decide or approve
- Materials / deliveries: what arrived, and anything damaged or missing
Photo tips
- Same spot, same angle for overview shots each visit, so progress is easy to see.
- Before covering anything up, like wiring, plumbing, or insulation, photograph it. Those pictures are valuable later.
- Measure in the frame when size matters.
Build the report in SnapToPDF
- Open snaptopdf.com and rename the project, for example "Johnson kitchen: Week 3 report".
- Add the five sections above.
- Snap and note as you walk the site. Save + new section moves you along.
- Tap Make PDF and send it to the client and PM.
Numbered items help on calls: "On #6, do you want the outlet moved left?"
Write notes people can scan
- Start with the result: "Cabinets installed, upper and lower."
- Put decisions in bold, like Need tile choice by Friday.
- Keep each note to one or two lines.
FAQ
How often should I send it? Daily for short, fast jobs; weekly for longer ones. Pick one and stick to it.
Can I reuse sections? Delete last week's items (or start a new project) and keep the same section names.
Make your PDF with SnapToPDF. It's free and works in your phone's browser. There's no account, and your photos never leave your phone.
Open SnapToPDF