Document change orders and hidden conditions with photos (for contractors)
When you open a wall and find a surprise, photograph it before you fix it, so the change order is clear and the client approves it faster.
Rotted framing behind the tile. Old wiring in the wall. A beam that isn't where the plans say. Hidden conditions are the most common source of change orders, and of arguments about them. Photos taken before you cover anything up make the extra cost easy to understand.
This supports, and doesn't replace, the written change-order process in your contract.
When you find a hidden condition
- Stop and photograph it before any repair.
- Take a wide shot showing where it is in the house.
- Take close-ups of the problem, with a tape measure for scale.
- Photograph what the plans or scope said would be there, if relevant.
What the client needs to see
- What you found
- Why it has to be fixed: code, safety, or the original work won't hold
- What you propose doing
- The cost and schedule impact
Build it in SnapToPDF
- Open snaptopdf.com and rename the project "Davis bath remodel: change order #2".
- Sections: What we found, Proposed fix, After repair.
- Wide shot, then Add another photo for close-ups.
- Note plainly: "Subfloor rotted under toilet flange, about 3×3 ft. Must replace before tile. Est. $650, +1 day."
- Tap Make PDF, send it with your change-order form, and get approval before you proceed.
After the fix
Add photos of the completed repair to the After repair section and resend. It closes the loop, and it's great documentation for the homeowner.
FAQ
Is this useful on small jobs? Especially on small jobs, where a surprise $500 can feel big to a client.
Related: Daily job-site photo report
Make your PDF with SnapToPDF. It's free and works in your phone's browser. There's no account, and your photos never leave your phone.
Open SnapToPDF